Sciigoj pri transporto
komenco - fino / header / cause / effectdescription
-

To accommodate renovations at Providence Station, construction barriers have been installed and the southern stairwell to Track 1 is out of service. Staircase access is available to Track 3 and Track 5.


UNKNOWN_CAUSEUNKNOWN_EFFECT
Affected lines: <br>Foxboro Event Service <br>Providence/Stoughton Line

Trajno Providence/Stoughton Line
-

There is no accessible path connecting the inbound and outbound platforms at Wellesley Square Station. The existing path includes steep slopes and is long. Designs are underway to provide for a fully compliant pathway.


UNKNOWN_CAUSEUNKNOWN_EFFECT
There are accessible mini-high platforms at the western end of both the Track 1 and Track 2 sides. However, the existing pedestrian path between the two sides is long and includes steep slopes, especially on the Crest Road bridge over the tracks. Designs are underway to provide for a fully compliant pathway.

Trajno Framingham/Worcester Line
-

Littleton/Route 495 passengers can expect occasional traffic and detours when accessing the station due to the Foster Street reconstruction work.


UNKNOWN_CAUSEUNKNOWN_EFFECT
Scheduled to complete sometime in 2027, the reconstruction of Foster Street includes widening and resurfacing, with the addition of bicycle lanes.

Trajno Fitchburg Line
-

The Riverside Ave entrance at Campello Station is currently closed. Passengers may continue to use the Plain St entrance.


UNKNOWN_CAUSEUNKNOWN_EFFECT
Affected lines: <br>Fall River/New Bedford Line

Trajno Fall River/New Bedford Line
-

From March through June, 2026, Wickford Junction Garage will be undergoing renovation. Visitors can expect one level at a time to be inaccessible as crews work to complete each floor.


UNKNOWN_CAUSEOTHER_EFFECT


Trajno Providence/Stoughton Line
-

The platform at Jackson Square is undergoing renovations to improve safety and accessibility. Sections of the platform are unlevel, which may make it difficult for some riders to board and exit trains.


UNKNOWN_CAUSEUNKNOWN_EFFECT
Please see station personnel or use a station call box to request assistance.

Metro Orange Line
-

Courthouse Escalator 415 (Airport/Design Center platform to lobby) unavailable due to ongoing construction at the station.


MAINTENANCENone


Buso SL3Buso SL1Buso SL2
-

Courthouse Escalator 417 (Airport/Design Center platform to south lobby) is unavailable due to ongoing construction at the station.


MAINTENANCENone


Buso SL3Buso SL1Buso SL2
-

Bowdoin Escalator 125 (Lobby to street) is unavailable until further notice, pending replacement.


MAINTENANCENone
The escalator will remain out of service for the foreseeable future. This decision was made after a thorough inspection determined that corrosion on the escalator’s steel truss was so severe that it could not be repaired further and that a complete replacement of the escalator would be required. Replacing the escalator at this location requires a more extended unit meeting modern escalator safety requirements. This longer unit will require significant alteration to the station entrance to meet code requirements. The MBTA has currently begun design work to understand what station upgrades will be needed. <br> <br>Due to these complexities, we expect the escalator will remain out of service for a significant time. We recognize the challenges this poses to our riders, and please know we are working to identify a solution as quickly as possible. In the meantime, Government Center Station, which is fully accessible and serves the Blue Line, is under a quarter-mile from Bowdoin Station.

Metro Blue Line
-

Andrew Escalator 123 (Ashmont/Braintree platform to busway) is unavailable until further notice, pending replacement.


MAINTENANCENone


Metro Red Line
-

Oak Grove Escalator 105 (Commuter Rail platform to unpaid lobby) unavailable


UNKNOWN_CAUSENone


Trajno Haverhill Line
-

State Escalator 6 (Oak Grove platform to Old State House lobby) unavailable


UNKNOWN_CAUSENone


Metro Orange Line
-

Malden Center Escalator 312 (Street level to Commuter Rail platform) unavailable due to maintenance.


MAINTENANCENone


Trajno Haverhill Line
-

The bus stop at Brookline Ave @ Longwood Ave (outbound) has moved due to construction. Please board buses at Brookline Ave @ Deaconess Rd.


CONSTRUCTIONSTOP_MOVED
Affected routes: <br>60 <br>65

Buso 60Buso 65
-

The stairway connecting the Jackson Square lobby and the south end of the platform is closed until winter 2026. Use the stairway at the north end of the platform. This closure is for the construction of a new stairway and a second elevator.


CONSTRUCTIONUNKNOWN_EFFECT
Please see station personnel or use a station call box to request assistance.

Metro Orange Line
-

Route 429 outbound is detoured due to construction, skipping Oxford St @ Washington St & Oxford St @ Market St. The closest outbound stops with service are Lynn Station & Market St @ Liberty St.


CONSTRUCTIONDETOUR


Buso 429
-

Lynn Parking Garage is partially closed, but has sufficient parking capacity to accommodate daily demand.


UNKNOWN_CAUSEOTHER_EFFECT


Buso 441Buso 439Buso 456Buso 435Buso 426Buso 455Buso 429Buso 442Buso 436
-

Winchester Center Elevator 749 (Track 1 (outbound platform) to Main St) unavailable


UNKNOWN_CAUSENone
Please use nearby ramp to the platform.

Trajno Lowell Line
-

Hingham/Hull Ferry: Portions of the Town of Hull parking lot at the Hull ferry terminal are blocked off for sewer pump station construction work. More information is available at https://www.town.hull.ma.us/


UNKNOWN_CAUSEOTHER_EFFECT


Akva buso Hingham Ferry
-

Hingham Ferry Parking Notice: Passengers should allow for extra time to park and to access the ferry in Hingham due to work being done for the new dock. In addition, Route 220 buses are bypassing the shipyard and are remaining on Route 3A.


UNKNOWN_CAUSEOTHER_EFFECT
Pedestrian Access: <br>There is no access between the Hingham Ferry Terminal and DCR building. Pedestrian access to and from the ferry dock is through and around the west side of the Hingham Ferry Terminal. Some sidewalk access at the Terminal may also be restricted during this work. <br> <br>Shipyard Drive: <br>Shipyard Drive is closed to traffic in front of the Hingham Ferry Terminal. Traffic is being rerouted through the Hingham Parking lot. Drop-offs and pick-ups have been relocated to the parking lot. Traffic police and signage will be in place to direct traffic.

Akva buso Hingham/Hull Ferry
-

Lynn Elevators 929 (Street to parking garage) and 930 (Street to parking garage) are unavailable until further notice. Please use the accessible parking spaces on the ground level of the garage while the elevators are out of service.


MAINTENANCENone


Buso 441Buso 439Buso 456Buso 435Buso 426Buso 455Buso 429Buso 442Buso 436
-

Route 556 inbound is detoured, skipping Hammond St @ Plympton St due to maintenance. The closest stops with service are 184 Hammond St & Hammond St @ Lawrence St.


MAINTENANCEDETOUR


Buso 556
-

Andrew Escalator 124 (Ashmont/Braintree platform to busway) is unavailable.


UNKNOWN_CAUSENone


Metro Red Line
-

Alewife Escalator 353 (Main concourse to busway) is unavailable due to maintenance.


MAINTENANCENone


Metro Red Line
-

Alewife Escalator 351 (Main concourse to platform) is unavailable due to maintenance.


MAINTENANCENone


Metro Red Line
-

Forest Hills Pedal and Park is experiencing access issues and will be closed for repairs until further notice.


MAINTENANCEOTHER_EFFECT


Buso 50Buso 32Buso 51Buso 35Buso 38Buso 21Buso 33Buso 39Buso 30Metro Orange LineBuso 40Buso 16Trajno Franklin/Foxboro LineBuso 34Buso 36Buso 42Buso 31Trajno Needham LineBuso 34EBuso 37
-

Route 558: Four stops have moved due to construction. Moved inbound stops: Commonwealth Ave @ Islington Rd & Commonwealth Ave opp Marriott. Moved outbound stops: Commonwealth Ave @ Islington Rd & Commonwealth Ave @ Marriott.


CONSTRUCTIONSTOP_MOVED


Buso 558
-

Woburn St @ Lowell St - Reading Sq stop has moved due to a safety issue with the nearby railroad crossings. Riders can board a bus at the Main St @ Lowell St stop (250 ft away) for inbound and outbound service.


UNKNOWN_CAUSESTOP_MOVED
Affected routes: <br>137

Buso 137
-

The Endicott Mini-high platform project has begun. Passengers and local residents can expect construction vehicles and activity during the day through the Winter of 2026.


UNKNOWN_CAUSEUNKNOWN_EFFECT
Affected lines: <br>Franklin/Foxboro Line

Trajno Franklin/Foxboro Line
-

Downtown Crossing Elevator 891 (Oak Grove platform to Franklin Street) is closed for maintenance. It is scheduled to return to service on September 22.


MAINTENANCENone
The elevator is closed for major equipment upgrades that will significantly improve the long-term reliability of this elevator. <br> <br>To exit: Travel down the Summer St concourse towards the Red Line. About halfway down the concourse, take a left through the set of glass doors marked 101 Arch St. Follow signs to the elevator. Take elevator to the 101 Arch St lobby and exit on Summer St. <br> <br>To board: Proceed to 101 Arch St on Summer St (across from Macy’s). Take elevator located in the rear-left corner of the lobby to Summer St concourse. At the concourse, turn right and follow signs to Oak Grove platform. <br>

Metro Red Line
-

Downtown Crossing Elevator 870 (Ashmont/Braintree platform to Summer Street Concourse) is closed for maintenance. It is scheduled to return to service on September 22.


MAINTENANCENone
The elevator is be closed for major equipment upgrades that will significantly improve the long-term reliability of this elevator. <br> <br>To exit: Exit the train onto the center platform at Park Street Station. Travel to the south end of the platform and take Elevator 808 to the Winter St concourse, then elevator 804 to Winter St. <br> <br>To board: Take an Alewife train to Park Street Station (1 stop). Exit train onto the center platform. Transfer to an Ashmont or Braintree train.

Metro Red Line
-

Park Street Elevator 812 (Green Line underpass to Government Center & North platform) is closed for maintenance. It is scheduled to return to service on September 22.


MAINTENANCENone
This elevator is closed for major equipment upgrades that will significantly improve its long-term reliability. <br> <br>To board a train to Copley and West: Follow signs to the Red Line and take Park Street Elevator 808 to the Red Line platform. Then use Park Street Elevator 979 to the Green Line Copley and West platform.

Tramvagoneto DTramvagoneto CTramvagoneto ETramvagoneto B
-

Park Street Elevator 823 (Green Line underpass to Copley & West platform) is closed for maintenance. It is scheduled to return to service on September 22.


MAINTENANCENone
This elevator is closed for major equipment upgrades that will significantly improve its long-term reliability. <br> <br>To board a northbound train: Proceed to the end of the platform and take Park Street Elevator 979 to the Red Line. At the end of the Red Line platform, use Elevator 808 to access the Winter St concourse and Green Line northbound platform.

Tramvagoneto DTramvagoneto CTramvagoneto ETramvagoneto B
-

The Stoughton mini-high platform is out of service until further notice. For passengers with accessibility needs, please use the portable lift.


UNKNOWN_CAUSENone


Trajno Providence/Stoughton Line
-

Select areas of the Anderson/Woburn MBTA Daily Lot and Gated Overnight Lot will be temporarily closed for major paving and infrastructure improvement work.


UNKNOWN_CAUSEOTHER_EFFECT
Beginning July 13, 2026, the Woburn Anderson Regional Transportation Center will undergo a major paving and infrastructure improvement project, with work expected to be completed by November 16, 2026. <br> <br>To support these critical renovations and enhance the long-term safety and functionality of the facility, select areas of the MBTA Daily Lot and the gated Overnight Lot will be temporarily closed throughout the construction period. <br> <br>Motorists and facility users are encouraged to plan accordingly and carefully follow all posted signage, traffic control measures, and parking restrictions to ensure a safe and efficient experience during the project.

Trajno Lowell Line
-

The Wyoming Hill Mini-high platform project has begun. Passengers and local residents can expect construction vehicles and activity during the day through the Winter of 2026.


UNKNOWN_CAUSEUNKNOWN_EFFECT
Affected lines: <br>Haverhill Line

Trajno Haverhill Line
-

American Legion Hwy @ Revere St is closed due to construction. For Routes 426 and 450, the closest stop with service is American Legion Hwy @ Hutchinson St. For Routes 424 and 455, the closest stop with service is Revere St @ Stowers St.


CONSTRUCTIONNO_SERVICE
Affected routes: <br>424 <br>426 <br>450 <br>455

Buso 426Buso 455Buso 450Buso 424
-

Route 220 detoured due to construction. The closest stops with inbound service are 319 Lincoln St & Lincoln St opp Lincoln Plaza. The closest stops with outbound service are Lincoln St @ Lincoln Plaza & 322 Lincoln St.


CONSTRUCTIONDETOUR
Skipped outbound stops: <br>Hingham Shipyard @ Ferry Terminal <br> <br>Skipped inbound stops: <br>Hingham Shipyard @ Ferry Terminal

Buso 220
-

Worcester Elevator 782 (Parking lot to pedestrian bridge) is unavailable. Please use elevator in main building at 2 Washington Sq.


UNKNOWN_CAUSENone


Trajno Framingham/Worcester Line
-

South Station Escalator 388 (Lobby to CSA area) is unavailable due to maintenance.


MAINTENANCENone


Buso SL3Buso SL1Metro Red LineBuso SL2
-

McGrath Hwy @ Poplar St (outbound) has been temporarily relocated to the front of the Mercedes Benz dealership due to construction.


CONSTRUCTIONSTOP_MOVED
Affected routes: <br>80 <br>87 <br>88

Buso 80Buso 87Buso 88
-

Courthouse Escalator 418 (Lobby to Seaport Boulevard, Fan Pier Boulevard) is unavailable due to maintenance.


MAINTENANCENone


Buso SL3Buso SL1Buso SL2
-

Green St @ Magazine St stop is closed through Friday, Aug 28, due to construction. Riders can board at Western Ave @ Green St.


CONSTRUCTIONNO_SERVICE
Affected routes: <br>70

Buso 70
-

Route 47 inbound is detoured through Friday, August 28, and is skipping the stop at Green St @ Magazine St for construction. Service is originating at Green St @ Pearl St.


CONSTRUCTIONDETOUR
Skipped inbound stops: <br>Green St @ Magazine St

Buso 47
-

Porter Escalator 510 (Ashmont/Braintree platform to paid lobby) is unavailable due to maintenance.


MAINTENANCENone


Metro Red Line
-

Green Line: No trains between North Station & Babcock St (B), Cleveland Circle (C), Kenmore (D), & Heath St (E) through August 16. Use buses between Babcock St, Cleveland Circle, Heath St (Rt 39) & Copley/Back Bay. Use the Orange Line downtown.


UNKNOWN_CAUSEREDUCED_SERVICE
Travel Time: <br>Riders should allow for extra travel time. Rider trip times are expected to be at least 25 minutes longer than usual. <br> <br>Accessibility: <br>All shuttle buses are accessible to riders with disabilities. Accessible van service will be available for Green Line stops between Kenmore & North Station. See station personnel for assistance. <br> <br>Bus Alternatives: <br>Route 39 Bus will be fare-free. This route runs parallel to the E Branch. <br> <br>Route 57 Bus will be fare-free. This route runs parallel to the B Branch between Kenmore & Packard's Corner. <br> <br>Commuter Rail Alternatives: <br>Commuter Rail Worcester Line will be free to ride between Lansdowne, Back Bay, & South Station. Regular fares must be purchased for travel past Lansdowne. <br> <br>Shuttle Bus Locations: <br> <br>Copley: <br>Westbound - Stuart St @ Dartmouth St (Route 501/504 bus stop) <br> <br>Hynes Convention Center: <br>Eastbound & Westbound - Commonwealth Ave @ Massachusetts Ave <br> <br>Kenmore: <br>Eastbound - 512 Commonwealth Ave <br>Westbound - 497 Commonwealth Ave <br> <br>Blandford Street: <br>Eastbound - Commonwealth Ave @ Blandford St (Route 57 bus stop) <br>Westbound - Commonwealth Ave @ Silber Way (Route 57 bus stop) <br> <br>Boston University East: <br>Eastbound - Commonwealth Ave @ Hinsdale St (Route 57 bus stop) <br>Westbound Stop - Commonwealth Ave @ Granby St (Route 57 bus stop) <br> <br>Boston University Central: <br>Eastbound and Westbound - Commonwealth Ave @ St Mary's St (Route 57 bus stop) <br> <br>Amory Street: <br>Eastbound - Commonwealth Ave @ Pleasant St (Route 57 bus stop) <br>Westbound - Commonwealth Ave @ Buick St (Route 57 bus stop) <br> <br>Babcock Street: <br>Westbound only Drop Off - Commonwealth Ave @ Babcock St (Route 57 bus stop) <br>Eastbound riders can use the Amory St stop at Commonwealth Ave @ Pleasant St (Route 57 bus stop) <br> <br>St Mary's St: <br>No shuttles <br> <br>Hawes St: <br>Inbound - Beacon St @ Hawes St (1089 Beacon St) <br>Outbound - Beacon St opp Hawes St (1080 Beacon St) <br> <br>Kent St: <br>No shuttles <br> <br>Saint Paul St: <br>Inbound - Beacon St @ St Paul St (1253 Beacon St) <br>Outbound - Beacon St @ St Paul St (1200 Beacon St) <br> <br>Coolidge Corner: <br>Inbound - Beacon St @ Harvard St (1337 Beacon St) <br>Outbound - Beacon St @ Harvard St (1314 Beacon St) <br> <br>Summit Ave: <br>Inbound - Beacon St @ Marion St (1431 Beacon St) <br>Outbound - Beacon St @ Summit Ave (1440 Beacon St) <br> <br>Brandon Hall: <br>No Shuttles <br> <br>Fairbanks St: <br>Inbound - Beacon St @ Fairbanks St (1539 Beacon St) <br>Outbound - Beacon St @ Lancaster Ter (1550 Beacon St) <br> <br>Washington Sq: <br>Inbound - Beacon St @ Washington St (1640 Beacon St) <br>Outbound - Beacon St @ Washington St (1633 Beacon St) <br> <br>Tappan St: <br>Inbound - Beacon St @ Tappan St (1695 Beacon St) <br>Outbound - Beacon St @ Williston Rd (1700 Beacon St) <br> <br>Dean Rd: <br>Inbound - Beacon St @ Dean Rd (1773 Beacon St) <br>Outbound - Beacon St @ Corey Rd (1762 Beacon St) <br> <br>Englewood Ave: <br>Inbound - Beacon St @ Clinton Path (1855 Beacon St) <br>Outbound - Beacon St @ Englewood Ave (1856 Beacon St) <br> <br>Cleveland Circle: <br>Beacon St @ Cleveland Cir Station (1927 Beacon St)

Tramvagoneto DTramvagoneto CTramvagoneto ETramvagoneto B
-

Green Line E Branch: Symphony station is closed for major accessibility upgrades. Riders can use Prudential or Northeastern to access E Branch service. The station is expected to reopen in 2029.


UNKNOWN_CAUSENO_SERVICE
Alternate Service Options: <br>• Riders who typically board or disembark at Symphony can instead board or disembark at Northeastern University or Prudential, which are 0.3 miles away (or about a five-minute walk) from Symphony. <br> <br>• Riders are encouraged to instead consider travelling on the Orange Line at Massachusetts Avenue, which is 0.1 miles (or about a three-minute walk) from Symphony. <br> <br>• Riders may also use the Route 39, which operates parallel to the E branch in both directions along Huntington Avenue. <br> <br>Background: <br>Currently, there are no step-free pathways from the entrances to the platforms at Symphony, and the station is not able to be accessed by people with wheeled mobility devices. When construction is complete in spring 2029, Symphony will be enhanced with four new accessible elevators, raised platforms for easier boarding, accessible bathrooms, improved wayfinding, more lighting, and upgraded safety features, making the station safer and easier to use for all riders.

Tramvagoneto E
-

Concord Ave @ Chauncy St (outbound) will be closed due to construction on Tuesday, August 11, through Tuesday, August 25. Please board Route 74, 75, and 78 buses from Concord Ave opp Craigie St (outbound).


CONSTRUCTIONNO_SERVICE
Affected routes: <br>74 <br>75 <br>78

Buso 74Buso 78Buso 75
-

Chinatown Elevator 876 (Oak Grove platform to Washington St, Essex St) is unavailable due to maintenance.


MAINTENANCENone
To exit, exit the train at Tufts Medical Center and proceed to the Washington St exit. At street level, cross Washington St, then take a Silver Line SL4 or SL5 bus to Washington St and Essex St (Chinatown Station). Alternatively, if possible, travel 0.2 miles north on Washington St to Chinatown Station. To board, use Chinatown Elevator 922 to access the Forest Hills platform. Take a Forest Hills-bound train to Tufts Medical Center transfer to an Oak Grove-bound train.

Metro Orange Line
-

Forest Hills Escalator 129 (Orange Line platform to upper lobby) is unavailable due to maintenance.


MAINTENANCENone


Metro Orange Line
-

MBTA Ferry: High ridership is expected on all MBTA ferry routes this weekend. MBTA ferry service is provided on a first-come, first-served basis. Please arrive early and/or plan your travels accordingly.


UNKNOWN_CAUSEOTHER_EFFECT
Affected ferries: <br>Charlestown Ferry <br>East Boston Ferry <br>Hingham Ferry <br>Hingham/Hull Ferry <br>Lynn Ferry <br>Quincy Ferry <br>Winthrop Ferry <br>Winthrop/Quincy Ferry

Akva buso Charlestown FerryAkva buso Quincy FerryAkva buso Lynn FerryAkva buso East Boston FerryAkva buso Winthrop FerryAkva buso Hingham/Hull FerryAkva buso Winthrop/Quincy FerryAkva buso Hingham Ferry
-

Route 216 is detoured through 7 PM today, August 16. The closest inbound stops are Sea Street @ Cemetery & McGrath Hwy opp Southern Artery. The closest outbound stops are McGrath Hwy @ Brackett St & 55 Sea St.


OTHER_CAUSEDETOUR
Affected stops: <br>Coddington St @ Washington St (outbound) <br>Coddington St @ Quincy YMCA (outbound) <br>Coddington St @ Southern Artery (outbound) <br>Coddington St @ Southern Artery (inbound) <br>Coddington St @ Quincy High School (inbound)

Buso 216
-

Harvard Escalator 513 (Harvard Square to mezzanine) is unavailable due to maintenance.


MAINTENANCENone


Buso 77Buso 78Buso 86Buso 71Buso 66Buso 109Metro Red LineBuso 75Buso 73Buso 74Buso 96
-

Kenmore Escalator 430 (Lobby to busway, street) is unavailable due to maintenance.


MAINTENANCENone


Tramvagoneto DTramvagoneto CTramvagoneto B
-

Quincy Adams Escalator 346 (Unpaid lobby to garage level 2) is unavailable due to maintenance.


MAINTENANCENone


Metro Red Line
-

Wonderland Elevator 701 (Main lobby to garage) is unavailable due to maintenance.


MAINTENANCENone
Please use nearby Wonderland Elevators 702 or 703.

Buso 441Buso 439Buso 110Buso 424Metro Blue LineBuso 450Buso 426Buso 411Buso 455Buso 442Buso 116
-

Wonderland Elevator 702 (Main lobby to garage) is unavailable due to maintenance.


MAINTENANCENone
Please use nearby Wonderland Elevators 701 or 703.

Buso 441Buso 439Buso 110Buso 424Metro Blue LineBuso 450Buso 426Buso 411Buso 455Buso 442Buso 116
-

Route 66 is experiencing delays of about 20 minutes.


UNKNOWN_CAUSEOTHER_EFFECT


Buso 66
-

Haverhill Line Train 5217 (7:00 AM from North Station) is operating 5-15 minutes behind schedule between North Station and Haverhill.


UNKNOWN_CAUSEOTHER_EFFECT
Affected stations: <br>North Station

Trajno Haverhill Line
-

Providence Line Train 5815 (6:45 AM from South Station) is operating 5-15 minutes behind schedule between Hyde Park and Providence.


UNKNOWN_CAUSEOTHER_EFFECT
Affected stations: <br>Hyde Park <br>Readville <br>Route 128 <br>Canton Junction <br>Canton Center <br>Stoughton <br>Sharon <br>Mansfield <br>Attleboro <br>South Attleboro <br>Pawtucket/Central Falls <br>Providence

Trajno Providence/Stoughton LineTrajno Franklin/Foxboro Line
-

Worcester Line Train 5520 (7:10 AM from Worcester) is operating 5-15 minutes behind schedule between Wellesley Hills and South Station due to an earlier unruly passenger.


UNKNOWN_CAUSEOTHER_EFFECT


Trajno Framingham/Worcester Line
-

Route 16 is experiencing delays of about 20 minutes.


UNKNOWN_CAUSEOTHER_EFFECT


Buso 16
-

Government Center Escalator 444 (North Station & North platform to street) is unavailable due to maintenance.


MAINTENANCENone


Tramvagoneto DTramvagoneto CTramvagoneto ETramvagoneto B
-

Route 230 is detoured due to an accident. The closest stops with inbound service are S Franklin St @ Quincy St & N Franklin St @ Jewel Rd. The closest stops with outbound service are N Franklin St @ Union St & S Franklin St @ Laurel Pk.


ACCIDENTDETOUR
Skipped outbound stops: <br>S Franklin St opp Norfolk Rd <br>S Franklin St @ Chandler St <br>S Franklin St @ Adams St <br>S Franklin St @ Technical Park Dr <br>S Franklin St @ King Rd <br>S Franklin St @ Walsh Rd <br>S Franklin St @ Dresser Ave <br>S Franklin St @ Hillsdale Rd <br>549 S Franklin St <br>S Franklin St opp Quincy St <br> <br>Skipped inbound stops: <br>Opp 549 S Franklin St <br>S Franklin St opp Hillsdale Rd <br>S Franklin St @ Dresser Ave <br>S Franklin St opp Walsh Rd <br>S Franklin St opp King Rd <br>S Franklin St @ Holbrook HS <br>S Franklin St opp Adams St <br>S Franklin St opp Chandler St <br>S Franklin St @ Holbrook Park <br>S Franklin St @ Plymouth St

Buso 230
-

Fields Corner Elevator 958 (Paid lobby to Ashmont platform) is unavailable due to maintenance.


MAINTENANCENone
To exit, exit the train at Shawmut, then take an Alewife-bound train to Fields Corner and use Fields Corner Elevator 957. To board, use Fields Corner Elevator 957 to access the Alewife platform. Take an Alewife-bound train to Savin Hill, then transfer to an Ashmont-bound train.

Metro Red Line
-

Fitchburg Line Train 5412 (8:00 AM from Wachusett) is operating 5-15 minutes behind schedule between West Concord and North Station.


UNKNOWN_CAUSEOTHER_EFFECT
Affected stations: <br>West Concord <br>Concord <br>Lincoln <br>Silver Hill <br>Kendal Green <br>Brandeis/Roberts <br>Waltham <br>Waverley <br>Belmont <br>Porter <br>North Station

Trajno Fitchburg Line
-

Route 83 is experiencing delays of about 20 minutes due to a disabled bus.


TECHNICAL_PROBLEMOTHER_EFFECT


Buso 83
OK